Nigeria's First
Biophilic Estate

A 16,000SQM CofO-approved property in Lagos’s fast-growing urban axis,
with a 24-month development timeline.

A 16,000SQM CofO-approved property in Lagos’s fast-growing urban axis, with a 24-month development timeline.

Developed by:

Mentioned & Featured In:

We're building:

Unique Location

The Villa is strategically located within the Eleko Development Zone, one of the most sought-after axes in Ibeju-Lekki due to its proximity to several catalytic projects transforming Lagos.

Landmarks near 'The Villa'

"This area is part of Eleko development belt, which means it's attracting planned estates, private infrastructure, and top-tier investors. The roads are being expanded, access improved, and government interest heightened."

Being in The Villa places you in a growing eco-residential hub, minutes from commercial powerhouses, combining serenity and long-term capital growth.

Philip Babalola

CEO, Uvest Realty

The Eleko Infrastructure:
What's Special?

In May 2025, President Tinubu commissioned the first 30 km stretch of the Lagos–Calabar Coastal Highway, from Ahmadu Bello Way to Eleko Village on the Lekki Peninsula. This newly built six-lane dual carriageway is designed to significantly uplift connectivity, commerce, and mobility along the coastline.

The Lagos State Government, led by Governor Sanwo-Olu, started expanding the Eleko Junction to Epe T-Junction corridor into a six-lane rigid pavement road (approx. 18.7 km). As of recent updates, sections of this heavily trafficked route have been resurfaced, with complete road markings, drainage systems, pedestrian walkways, and dedicated truck lanes.

Multiple infrastructure updates from early to mid‑2025 highlight active reconstruction of the Eleko Beach Road and internal access lanes, showing progress on surfaced roads, drainage, and street lighting.

In July 2025, the federal government confirmed a $747 million loan to accelerate construction of the Lagos-Calabar Coastal Highway, with Section 1 (Ahmadu Bello to Eleko) already funded and underway.

Project Timeline

The Villa is a four-phase project. Phase One is complete, and the remaining phases, from identity to full build, are set for completion within 18 months.

PHASE 01: PLANNING & GROUNDWORK

Jan 2025 - June 2025

PHASE 02: ESTATE IDENTITY & LAUNCH

July 2025 - Dec. 2025

PHASE 03: CONSTRUCTION - PHASE 1 UNITS

Jan 2026 - June 2026

PHASE 04: CONSTRUCTION - PHASE 1 UNITS

July 2026 - Dec. 2026

Project Gallery

(Click to view, Drag to Scroll)

Your Future Home, Realized.

Fill out this short form and our team will reach out directly to schedule an inspection.

CONTACT

+(234) 901 472 0758

thevilla@uvest.homes

Eleko, Lagos, Nigeria

All Rights Reserved.
© The Villa - 2025​